Outdoor water supply and sewage removal systems. Total length of engineering networks 8 km Customer and object: Vilniaus kogeneracinė jėgainė UAB Place and time: Vilnius, Lithuania. 2018-2019
Installation of a heat supply line in Kaunas cogeneration plant. A heat supply line of factory pre-insulated pipes (PUR) DN 610/800, length 0.62 km Customer and object: Kauno kogeneracinė jėgainė UAB Place and time: Kaunas, Lithuania. 2018-2019
Manufacture of first degree evaporator packages for a boiler OU-66. Pressure 5 MPa, temperature 265°C – 315°C Customer and object: Lifosa AB chemical plant Place and time: Kėdainiai, Lithuania. 2018-2019
Heat recovery boiler repairs. Heat recovery boiler KU-126, pressure 40 bar, temperature 255°C Customer and object: VKG Oil, Petroter Unit Place and time: Kohtla-Järve, Estonia. 2017-2018
Capital repairs of T-2 (PT-80/100-130/13) and TG-2 (TVF-120-2Y3). Dismantling and assembly of a separator, dismantling and assembly of service platforms, dismantling and assembly of pipelines, thermal processing of pipelines Customer and object: Orlen Lietuva AB Place and time: Mažeikiai, Lithuania. 2017
Installation of the process part of a production line with ancillary equipment Customer and object: Neo Group, polyethylene terephtalate granules plant Place and time: Klaipėda, Lithuania. 2016-2018
Manufacture, supply and installation of pipelines. Installation of furnaces 2×12 MW Customer and object: Neo Group, polyethylene terephtalate granules plant Place and time: Klaipėda, Lithuania. 2015-2017
Preparation of a working design for the reconstruction of heat supply networks in Kaunas, supervision over the implementation of the project, and reconstruction works. A heat supply line of factory pre-insulated pipes (PUR) DN 500/710, length 1.18 km and DN 610/800 – 0.46 km Customer and object: Kauno energija UAB Place and time: Kaunas, Lithuania. […]
• Installation of biofuel boilers (2 pc.). Boilers 2×25 MW, water/steam – average temperature 287.7°C-512°C, pressure 71 bar • Installation of the boiler and furnace connection (2 pc.) • Installation of electrostatic filters (2 pc.) • Installation of a DH2 heat exchanger • Installation of a deaerator Customer and object: VAO biofuel cogeneration plant Place […]
Capital repairs of Unit 2 of Kruonis Hydro Pumped Storage Power Plant including hydro turbine RONT 115/812-B-630 and generator VGDS-1025/245-40U4. Capacity of power of the hydro turbine 225000 kW, 150 rpm, differential water flow 115 m. Generator nominal capacity 248600 kVA, nominal stator current 9100 A Customer and object: Lietuvos energijos gamyba AB, Kruonis HPSPP Place […]