• Mechanical works of repairing the boiler and its auxiliary equipment
• 85 MW grate-firing type boiler, generating steam of 47 bar and 400°C
• Installation of a steam turbine with a generator and heat exchangers
• Installation of a flue gas cleaning system
Customer and object:
Fortum UAB, waste incineration co-generation plant
Place and time:
Klaipėda, Lithuania. 2018