Installation of pressure parts and components of a boiler. Boiler capacity 112.4 t/h, temperature 130°C-450°C, pressure 75-92 bar
Customer and object:
Baumgarte GMBH. Kaunas cogeneration plant (waste incineration)
Place and time:
Kaunas, Lithuania. 2017-2020