• Installation of biofuel boilers (2 pc.). Boilers 2×25 MW, water/steam – average temperature 287.7°C-512°C, pressure 71 bar
• Installation of the boiler and furnace connection (2 pc.)
• Installation of electrostatic filters (2 pc.)
• Installation of a DH2 heat exchanger
• Installation of a deaerator
Customer and object:
VAO biofuel cogeneration plant
Place and time:
Tallinn, Estonia. 2015-2017