Installation of Boilers

• Installation of biofuel boilers (2 pc.). Boilers 2×25 MW, water/steam – average temperature 287.7°C-512°C, pressure 71 bar

• Installation of the boiler and furnace connection (2 pc.)

• Installation of electrostatic filters (2 pc.)

• Installation of a DH2 heat exchanger

• Installation of a deaerator

Customer and object:

VAO biofuel cogeneration plant

Place and time:

Tallinn, Estonia. 2015-2017