Manufacture and Installation of Metal Structures

• Manufacture and installation of metal structures, supports and service platforms

• Installation of process pipelines and equipment. Boilers 2×7 MW, pressure 8 bar, temperature 150°C, biofuel furnace 2xQ-7 MW

Customer and object:
Ekopartneris UAB, water heating boiler house

Place and time:
Vilnius, Lithuania. 2014-2015