Reconstruction of a Hot Water Boiler

• Reconstruction of E-2 hot water boiler No 1 PTVM – 100 in order to reduce nitric oxide emissions. Boiler 116.3 MW, capacity 100 t/h, temperature 70°C-150°C, pressure P-25 bar

• Dismantling and installation of pipelines, air ducts and service platforms

Customer and object:
Vilniaus šilumos tinklai UAB. Vilnius Power Plant E-2

Place and time:
Vilnius, Lithuania. 2017