Manufacture of first degree evaporator packages for a boiler OU-66. Pressure 5 MPa, temperature 265°C – 315°C Customer and object: Lifosa AB chemical plant Place and time: Kėdainiai, Lithuania. 2018-2019
Heat recovery boiler repairs. Heat recovery boiler KU-126, pressure 40 bar, temperature 255°C Customer and object: VKG Oil, Petroter Unit Place and time: Kohtla-Järve, Estonia. 2017-2018
Capital repairs of T-2 (PT-80/100-130/13) and TG-2 (TVF-120-2Y3). Dismantling and assembly of a separator, dismantling and assembly of service platforms, dismantling and assembly of pipelines, thermal processing of pipelines Customer and object: Orlen Lietuva AB Place and time: Mažeikiai, Lithuania. 2017
Installation of the process part of a production line with ancillary equipment Customer and object: Neo Group, polyethylene terephtalate granules plant Place and time: Klaipėda, Lithuania. 2016-2018
Manufacture, supply and installation of pipelines. Installation of furnaces 2×12 MW Customer and object: Neo Group, polyethylene terephtalate granules plant Place and time: Klaipėda, Lithuania. 2015-2017
Manufacture and installation of process pipelines Customer and object: Grigeo Klaipėdos Kartonas cardboard factory Place and time: Klaipėda, Lithuania. 2016