• Installation of biofuel boilers (2 pc.). Boilers 2×25 MW, water/steam – average temperature 287.7°C-512°C, pressure 71 bar • Installation of the boiler and furnace connection (2 pc.) • Installation of electrostatic filters (2 pc.) • Installation of a DH2 heat exchanger • Installation of a deaerator Customer and object: VAO biofuel cogeneration plant Place […]
Capital repairs of Unit 2 of Kruonis Hydro Pumped Storage Power Plant including hydro turbine RONT 115/812-B-630 and generator VGDS-1025/245-40U4. Capacity of power of the hydro turbine 225000 kW, 150 rpm, differential water flow 115 m. Generator nominal capacity 248600 kVA, nominal stator current 9100 A Customer and object: Lietuvos energijos gamyba AB, Kruonis HPSPP Place […]
Installation of pressure parts and components of a boiler. Boiler capacity 112.4 t/h, temperature 130°C-450°C, pressure 75-92 bar Customer and object: Baumgarte GMBH. Kaunas cogeneration plant (waste incineration) Place and time: Kaunas, Lithuania. 2017-2020
Correction of defects and repairs of E-2 steam turbine equipment Customer and object: Vilniaus šilumos tinklai AB. Vilnius Power plant E-2 Place and time: Vilnius, Lithuania. 2018-2021
Installation of a 20 MW steam boiler and a biofuel furnace Customer: Danpower Baltic cogeneration plant Place and time: Kaunas, Lithuania. 2015
• Manufacture and installation of metal structures, supports and service platforms • Installation of process pipelines and equipment. Boilers 2×7 MW, pressure 8 bar, temperature 150°C, biofuel furnace 2xQ-7 MW Customer and object: Ekopartneris UAB, water heating boiler house Place and time: Vilnius, Lithuania. 2014-2015
Repairs of boilers, auxiliary equipment and pipelines Customer and object: Vilniaus energija UAB Place and time: Vilnius, Lithuania. 2014-2017
Correction of defects and repairs of steam turbines AT-12-2, capacity of power 12000 kW, 3000 rpm; MARC-4-C01, capacity of power 16700 kW, 8120 rpm, steam pressure 37.5 bar, steam temperature 435°C Customer and object: Vilniaus šilumos tinklai UAB. Vilnius Power Plant E-2 Place and time: Vilnius, Lithuania. 2015-2018
Repairs of process equipment, structures and engineering networks. Capital repairs of Unit 2 of Kruonis Hydro Pumped Storage Power Plant including hydro turbine RONT 115/812-B-630 and generator VGDS-1025/245-40U4. Capacity of power of the hydro turbine 225000 kW, 150 rpm, differential water flow 115 m. Generator nominal capacity 248600 kVA, nominal stator current 9100 A Customer and […]
• Installation of pipelines for condensate, FCG condensate, steam, drainage and sampling • Manufacture and installation of the feed water pipeline • Manufacture and installation of the boiler purging line • Manufacture and installation of the steam pipeline. Temperature 287.7°C – 512°C, pressure 71 bar Customer and object: VAO biofuel cogeneration plant Place and time: […]