Reconstruction of a Hot Water Boiler

• Reconstruction of E-2 hot water boiler No 1 PTVM – 100 in order to reduce nitric oxide emissions. Boiler 116.3 MW, capacity 100 t/h, temperature 70°C-150°C, pressure P-25 bar • Dismantling and installation of pipelines, air ducts and service platforms Customer and object: Vilniaus šilumos tinklai UAB. Vilnius Power Plant E-2 Place and time: Vilnius, […]

Boiler Mechanical Repair Works

• Mechanical works of repairing the boiler and its auxiliary equipment • 85 MW grate-firing type boiler, generating steam of 47 bar and 400°C • Installation of a steam turbine with a generator and heat exchangers • Installation of a flue gas cleaning system Customer and object: Fortum UAB, waste incineration co-generation plant Place and […]

Installation and Dismantling of a Power Plant Equipment

Dismantling and installation works on a hot water boiler PTVM-100 No 2 pipe screens, air ducts, platforms and pipelines. Power 116,3 MW, capacity 100 t/h, temperature 70°C-150°C, pressure P-25 bar Customer and object: Vilniaus šilumos tinklai UAB. Vilnius Power Plant E-2 Place and time: Vilnius, Lithuania. 2018

Installation of a Flue Gas Condensing Economizer

• ESP manufacture and installation • Installation of a flue gas condensing economizer Customer and object: Ekopartneris UAB, water heating boiler house Place and time: Kaunas, Lithuania. 2014